2020-07-02 880
The quality of the delivery of materials or volume calculation; When transported into items, a number of delivery per hour to accounting. Transport belt conveyer delivery speed: progress speed transport ability to progress. In the ship to take for traction and length is larger, the delivery speed is increased. But high-speed belt conveyer to be attention to the problem of vibration and nois
2020-07-02 968
Asphalt mixing bucket elevator is a very important equipment in mixing. It is continuously discharged to the bucket type through the aggregate lifting of different scales of the dryer to improve the height of the vibrating screen gravel, stone grading standards, qualified stone particles to the asphalt mixing equipment, uniform mixing.Function of bucket elevator in asphalt aggregate mixingStone as
2020-07-02 944
&Bucket elevator fault analysis and treatment planCause analysis and treatment of common problems of bucket elevator:1: hopper belt slippingBucket elevator is a kind of information about the use of conflicting torque between the belt and the elevator shaft of hopper head wheel. If the belt tension is insufficient, the hopper will lead to belt slip. At this time, the machine should be stopped immed
2020-07-02 935
There are four reasons for the hopper falling of belt bucket elevator1. The direct cause of hopper falling and deformation is that too much material is fed into the machine frame and the lifting resistance is increased and the hopper is not running smoothly. At this time, the machine should be shut down immediately, the plug-in plate under the frame should be drawn out, the accumulated materials i
2020-07-02 934
&Installation process:1. Outrigger and intermediate frame of belt conveyor: before installation, use theodolite to find the center line, and then lead out the pile point position of each leg according to the position of the center line. If there is embedded iron, it should be adjusted according to the position of the embedded iron, so as to facilitate the installation company. Each leg should be f
2020-07-02 847
The conveying capacity and tension required by customers for the materials transported by belt conveyor line will be different. For example, powder materials should be transported at low speed to prevent floating; brittle materials should be operated at medium speed to avoid jumping or breaking on the roller. Therefore, it is necessary to adjust the belt speed according to the actual situation. Wh
2020-07-02 789
1. Adjust the bearing idler group. When the belt of the belt line deviates in the middle of the whole belt conveyor, the direction of the idler group can be adjusted to adjust the deviation; during manufacturing, the device holes on both sides of the idler group are processed with long holes for adjustment. The detailed method is to which side the belt inclines, which side of the idler group moves